The concrete barrier wall replaced a guardrail on the I-85 at the I-75/85 Split. The project included removing guardrail and paved shoulder and installing concrete barrier wall, asphalt shoulder, and indentation rumble strips. Grading and grassing installation were performed behind the barrier wall, and striping where required.