Skip to main content
Precision 2000, Inc.
search
Menu
  • Home
  • Our Company
    • Awards and Recognitions
    • Leadership
      • Carlos Sánchez
      • Guiomar Obregón
    • Licenses and Certifications
    • Media Presence and Speaking Engagements
    • Social Responsibility
      • Fellowship Program
      • Scholarship Program
      • The P2K Classroom at Georgia Tech
      • P2K Internship Program
      • Georgia Hispanic Construction Association
      • Cross Keys High School
  • Markets
  • Our Projects
    • Aviation
    • Civil Infrastructure
    • Transportation
  • Video Gallery
    • P2K’s Blog
  • Jobs
  • Contact us
  • search
Press enter to begin your search
Close Search

Valdosta Regional Airport Drainage Improvements

This project included grading, drainage installation and repair in the in-fields located between Runway 4-22, Runway 17-35, and Taxiway “C” as well as some safety area regrading west of Runway 4-22.  Items of work included the demolition of existing drainage structures, topsoiling, removing and replacing approximately 65,000 cubic yards of unsuitable material, installing approximately 5,000 linear feet of storm drain pipe, installing finger drains and underdrains, repairing pipe joint and structure scour, installing concrete aprons around existing inlets, and installing erosion control measures.

  • Client: Valdosta Regional Airport
  • Location: Valdosta, GA
  • Value: $