This project included grading, drainage installation and repair in the in-fields located between Runway 4-22, Runway 17-35, and Taxiway “C” as well as some safety area regrading west of Runway 4-22. Items of work included the demolition of existing drainage structures, topsoiling, removing and replacing approximately 65,000 cubic yards of unsuitable material, installing approximately 5,000 linear feet of storm drain pipe, installing finger drains and underdrains, repairing pipe joint and structure scour, installing concrete aprons around existing inlets, and installing erosion control measures.