The Non Licensed Vehicle Road (NLVR) system comprises roughly 12 linear miles of a two-lane roadway that encircles the terminals and airfield. P2K has been entrusted with the essential task of addressing the most pressing repairs required for the roadway.
The project’s scope encompasses the removal and replacement of approximately 11,668 square yards of NLVR concrete pavement and the addition of asphalt shoulders. These tasks are executed with an expedited timeline to minimize disruptions to airport operations.