Due to major erosion control problems, a couple of Catch Basin Structure systems have been failing along Niskey Lake Rd. The scope of work entailed the restoration and repair of these two systems. P2K reconstructed the structures, placed new storm pipes and built two headwalls to achieve the proper collection of rainwater from the street. Also, backfilling and grading with select fill was done to accomplish proper compaction. Finally, in order to stabilize the storm structures and roadway we formed and poured flowable fill material.