P2K built a new culvert to replace the existing metal pipes that were insufficient to manage the water from the creek at the point where it crossed Mud Green Road. The new higher capacity arched culvert allows the waters from Mud Creek to flow without damaging the road.
The Project involved replacing two 72-inch corrugated metal pipes with a three arch aluminum culvert with a 21 ft span each. This upgrade eliminated the flooding issues caused by heavy rains in the Mud Creek area, it improved road safety for the local community.