This project will install a 250 linear foot concrete barrier wall along I-75 SB exit ramp 259A to I-285 EB within Cobb County. The scope of work includes the removal of the existing concrete curb throughout the length of the barrier wall, ground excavation for the barrier wall foundation, construction of 250 linear feet of concrete barrier following GDOT specifications, shoulder construction, striping, and signs installation.