P2K was hired to undertake the improvements to Holcomb Bridge exit and access ramps at GA 400. This project consisted of the South Bound exit ramp’s widening on GA SR400 at Holcomb Bridge Rd. The project included replacing traffic signal, lane reconfiguration, retaining walls, and signage replacement on GA SR400 from I-285 to Holcomb Bridge RD NB.