This project is a FastTrack job that consists on removing and replacing the cracked concrete all the repairs for each section has to be completed in 1 shift, this work includes the removal, and pour back of concrete using a High Early Strength mix with 2% non-chloride accelerant to open the road back to traffic after 4 hours of been poured. All work is accomplished in 7 hours, including the 4 hours of curing time before we put traffic on it.