Skip to main content

Fibercrete Spall Repair I-675

By June 5, 2020June 19th, 2020Projects, Video Gallery

The I-675 is an essential corridor in the south of Atlanta, connecting the I-285 and I-75. The concrete pavement on this highway is exposed to high traffic volumes generating spalls. The GDOT, as part of its Maintenance Program, has contracted P2K to repair a total of 252 Square yards of spalls with a hot applied patching material. The repairs were performed in all three lanes between the mile 0.31 and 9.59 of the I-675. This job includes traffic control and striping.