Valdosta Regional Airport Drainage Improvements

Home/Projects/Valdosta Regional Airport Drainage Improvements

Project Description

This project includes grading, drainage installation and repair in the in-fields located between Runway 4-22, Runway 17-35, and Taxiway “C” as well as some safety area regrading west of Runway 4-22.  Items of work include the demolition of existing drainage structures, topsoiling, removing nad rreplacing approximately 65,000 cubic yards of unsuitable material, installing approximately 5,000 linear feet of storm drain pipe, installing finger drains and underdrains, repairing pipe joint and structure scour, installing concrete aprons around existing inlets, and installing erosion control measures.

Client: Valdosta Regional Airport
Location: Valdosta, GA
Value: $1M - $2M
Year: 2011
Duration: 4 Months